New builds
Start to finish from foundation to final coat, run by one site team the whole way through.
Klipbank Construction plans, builds and hands over new homes, renovations and civil works across the Western Cape, with one site team accountable from the first sod to the final snag.
Single-room additions through to multi-unit developments. Every job runs on the same discipline: signed-off drawings, a fixed schedule, and a foreman who does not vanish once the deposit clears.
Start to finish from foundation to final coat, run by one site team the whole way through.
Room additions, second storeys and full renovations, built around families still living there.
Site clearing, foundations, retaining walls and stormwater, built to engineer spec.
Structural repairs, waterproofing and defect lists closed out without chasing.
A small, senior team. Not a call centre with a fleet of vans. The person who quotes your job is the person who checks it on site, and you keep one point of contact until the keys are handed over.
No mystery, no radio silence. Four stages, each one signed off before the next begins.
Start yoursA site visit, your drawings where they exist, and a written itemised quote. Materials, labour and preliminaries listed separately so you can see what you are paying for and cut scope if you want to. Valid 30 days, no obligation.
You get a written schedule with milestone dates, the name and mobile number of your foreman, and confirmation of every certificate before anyone breaks ground.
Weekly progress updates and photographs. Anything unforeseen gets stopped, priced and approved by you in writing before it proceeds. No surprise invoices at the end.
We walk the job with you, list every defect, close them out, and hand over with certificates and guarantees in one file. The site leaves clean.
Built once. Built right.
A sample of builds handed over in the last two years, from single dwellings to multi-unit developments.
4-bedroom family home, foundation to handover in 9 months.
Second-storey addition built over an occupied home.
Engineered retaining structure and stormwater works.
Full gut renovation of a 1960s semi-detached house.
Five-star average across 140+ handovers
Quoted in writing, started on the date they promised, and the site was swept clean every Friday. The second storey went up with us living downstairs the whole time.
Not staged. This is what the work actually looks like between the quote and the handover.
Tell us what you are building and we will come back to you within a business day. Site visits and quotes are free, and we will say so honestly if your job is not one for us.
We visit site, work from drawings where available, and give a written itemised quote, not a rough estimate. Materials, labour and preliminaries are listed separately so you can see exactly what you are paying for and adjust scope if you want to.
Quotes stay valid for 30 days and there is no obligation to proceed.
Yes. Public liability cover, COIDA registration and SACPCMP-registered site supervision on every project. Certificates are handed over with the quote, not promised later.
Regularly. Roughly half our renovations happen with the family still living there. We section off work areas with dust sheeting, keep noisy work inside agreed hours, and leave the house lockable and safe every evening.
Nothing gets charged that you have not approved in writing first. If something unforeseen appears once walls are open, we stop, price the variation, and you decide before we carry on. Surprise invoices at handover are the fastest way to lose a client, so we do not send them.
One named foreman for the whole project, plus our own trade teams. We do not hand your job to a sub-contractor you have never met. You get that foreman's mobile number on day one.
We work with an architect and engineer we have used for years, and we manage the submission on your behalf. If your plans are already approved, we build to them as drawn.
Cape Town and surrounds, including the Northern Suburbs, Winelands and West Coast. Send your address and we will confirm before quoting.
A bathroom is usually 3 to 4 weeks, a kitchen 4 to 6, a second-storey addition 4 to 6 months. Every quote carries a written schedule with milestone dates before we start, and we flag slippage the week it happens rather than at the end.